FindMyBids
Search

Find open bids

More bids like this: pipe installation

22 open bids. Sort: Best match Soonest deadline

Pro This is what every bid looks like on ProGet Pro →
Local · SC 15 days left

Installation of Redundant Water Main Piping

City of Folly Beach
Plain-English summaryThe city is prequalifying prime contractors to install ductile iron and high-density polyethylene water main piping. The project spans from James Island to Folly Beach using open cut and horizontal directional drilling methods.
Keywordswater mainutility constructionpipe installationdirectional drillingcivil engineering
Due Wed, Oct 14 at 6:00 PM  ✓ Check if you're ready View bid →
Train your matches ✓ More like this ✕ Not for me

Get bids like these by email

Save this search as a free alert. Pro sends new matches every morning with a plain-English summary.

Save as an alert