Local · VT
3 days left
Lamoille County Planning Commission
The project involves completing final design plans for the Centerville Brook dam removal and preliminary design planning for two downstream culverts in Hyde Park, Vermont. The work focuses on stream restoration and aquatic organism passage.
Public · VT
8 days left
Fitzgerald Environmental Associates
The town is seeking a contractor to replace a failed timber bridge with a pre-cast concrete box culvert. The project includes the installation of headwalls and wing walls at the inlet and outlet.
Public · VT
8 days left
Fitzgerald Environmental Associates
The town is seeking a contractor to stabilize a stream bank and roadway embankment on Old Brook Road. The project includes designing and installing a mechanically stabilized earth wall and soil nail stabilization system.
Public · VT
21 days left
Sustainable Woodstock
The project requires stabilizing a streambank at the Woodstock Community Garden using rootwads and reinforced soil slopes. Work includes site access, sediment control, rootwad installation, seeding, and mulching.